Showing posts with label schedule. Show all posts
Showing posts with label schedule. Show all posts

Monday, June 30

Picture bomb!

Jessa updated the HomeGrown HideAways website, adding to the blog and photo album, as well as switching a couple dates of workshops and lowering the workshop costs. Since my camera battery charger is still MIA, I stole some of her pictures. I'm going to do a quick recap of the time since my battery died...

We marked out the floor plan with marking paint directly on the foundation. We've had so many changes in the design- seeing it layed out on the ground helped a lot!
Phil and John (on the left) were the primary designers. You'll see in the photo above that we (Jeff and I, on the right) were filling bags before the design and forms were finished. I wrote about doing a lot of digging and screening in the last couple of weeks.

This is the screener (and Phil.) In the beginning, I scooped from the piles of dirt along the site directly onto the screen. The large rocks that were filtered out fell to the bottom of the screen and into a wheelbarrow (not pictured.) After a while, it was easier to shovel the dirt/clay into a bucket and pour that onto the screen. Someone would be on the other side filling bags with the finer clay/dirt mixture.

The first bags being layed were probably the most exciting, so far. There were six bags that we tamped and signed- Jessa, Phil, John, Adam, Jeff and I all got our own bags. (That's me in the picture, with Jeff and Adam's lower half.)

Our forms get a lot of questions from people who come to visit the site. Mostly, "Isn't that a small doorway?" The thing to understand about forms is that the earthbags will be stacked around them completely. Once the forms are surrounded and the arch is covered, the wood will be removed. The doorway that is in the middle of the (very large) wood arch is simply so that we can get from room to room when the walls get tall.


Each row gets two rings of bags. Each layer alternates (meaning that, in the above picture, the interior bags are vertical-ish while the exterior are horizontal-ish; for the next row, the interior will be horizontal and the top vertical.) The altering helps with structure- think bricks. In between each row of bags, we lay barbed wire. This is my favorite job on site, so far. In order to make the barbed wire stick, we have to individually poke each barb into the bags, alternating which side of the barb goes in.

We have had a lot of people helping to make the job go faster. (The picture above was taken at our end-of-day gathering.)


We haven't been at Michelle's much over the last couple of weeks, but there was one day that Phil, Jessa, Nathan and I snuck out there to get the foundation trench ready for gravel to be poured in it. This involved making cement bases for our timberframe logs.

We had to cut cardboard tubes down to size, using lines and levels and such to make sure that they were all at the same level (since the ground has a 5 inch slope from one side of the building to the other, this was very important.)

Nathan and I mixed cement. Those are 80 pound bags, so Nathan did the lifting. I held the mixer to make sure that it didn't tip. Tough job.

(I have terrible posture, I realize.) Nathan would tip the wheelbarrow up, Jessa or Phil would hold up a funnel to help guide the cement that I hoed out. Then someone would use the trowel to smooth out the top. We later stuck some J-bolts in the cement (and then got rained and hailed on and got covered in mud and dirt.)

(Today we were at John's. It was his birthday, so we had 3:00 rootbeer floats with the neighbors. Our fifth layer is done and our sixth layer is started, although, at the end of the day, we just filled bags. The electrical conduit was being placed between the fifth and sixth layer and it needs to be inspected tomorrow before we can continue placing bags. Jessa and I will be at Michelle's tomorrow and back at John's on Wednesday. Adam and Jeff are going to Florida, for different reasons, and Phil is in North Carolina on vacation with his family, so it will just be Jessa and I. Filling bags is somewhat time consuming, so Jessa suggested spending the later part of the afternoon filling bags- so we will have a stock ready for us Wednesday.)

Oh, and to clarify (because I was asked), "tamping" is compressing the contents of the bag (either using a large, flat bottomed chunk of cement ore a store-bought metal square with a broomstick-like handle) until the contents are very hard and bricklike. It requires a lot of repetitive lifting and thrusting downwards, but it works. Keeps the building solid.

Thursday, June 5

Workshop Schedule

HomeGrown HideAways has updated their website. The workshop schedule has been posted.

June 15-20 Earthbag Workshop 1, $500
Learn to build the first code approved earthbag dome home in Kentucky. Built in an intentional community, the techniques of earthbag construction and planning will be covered along with discussion of site and foundation preparation. This workshop offers plenty of on-site lessons to help participants learn the tools, tricks, and techniques of constructing with earthbags. Hands-on opportunities will help participants to gain a feel for the nature of dirt, clay, lime, and sawdust as building materials as well as earthbag as a technique for residential construction.
June 22-27 Earthbag Workshop 2, $500
See description above. Discounts available if registering for both.
July 6-11 Post & Beam/Timber Frame Workshop, $500
In this workshop, participants will learn the basics of building a post & beam structure. We will cover layout techniques, tool use, hardware, and joinery cutting methods. This workshop is part of a larger project to build a strawbale and cob art studio.
July 13-18, Earthbag Plaster, $500
Like any building, earthen structures need to be protected from the elements. Earthbag construction poses its own unique challenges and working within the dome structure creates many unique learning opportunities. This workshop will cover materials, mixing techniques, troweling and texturing, and using pigments to color plaster.
July 20-25, Strawbale Design/Build, $500
Come learn the basic skills behind one of the most popular techniques of natural construction: strawbale. Workshop participants will have the opportunity to work first-hand with strawbale design and construction and develop a greater understanding of and appreciation for straw as a building material.
July 27 - August 1, Building with Cob, $500
This workshop will provide participants with instructions for creating cob structures, an affordable, safe, and ecologically sound method of construction. Workshop participants will learn the tools and methods used while constructing a cob structure which complies with modern building standards.
August 3-8, Natural Plasters & Finishes 1, $500
Learn how to use clay and lime based plasters on a variety of different natural surfaces, such as earthbag, strawbale, and cob. This workshop will cover materials, mixing techniques, troweling and texturing, and using pigments to color plaster.
August 10-15, Natural Plasters & Finishes 2, $500
See description above. Discounts available if registering for both.


Wednesday, June 4

Exciting things are taking place!

I've had a couple of meeting since my last post. Yesterday, Phil, Jessa and I had an impromptu meeting to hammer out some details with the workshops and specific things that need to be completed before starting the workshops. I don't feel like I contributed too much, but I listened attentively.

Today, I woke up early, (said goodbye to Adam, who left today) and went with Phil and Jessa to meet Michelle at the codes office. Michelle had her two kids with her- a baby strapped to her chest and a hyper boy who really wanted some attention- cute as anything. She got her building permit (from the same guy who approved John's- he seemed friendly and fairly excited about the buildings. It was nice to see who the others had been working with for so long.) Her permit was not near as hard to get as John's, since she will have a timber-frame to support her structure. I got to look at the official floorplan for the studio and I think it's going to be beautiful. (For a reminder, Michelle has the strawbale and cob studio. John had the earthbag dome house.) Jessa took a picture of Michelle with her permit, so maybe I can get my hands on that and post it as well.

After going to the codes office, Phil and I met up with John to discuss his house some more. Phil had plans drawn out on his computer, which I think helped me to understand and visualize the house much better. I felt like this was a very good meeting- I understood and felt up to speed with the others. I might owe my cup of Mocha Jo a thanks. I think John's house is going to be wonderful and unique to look at and I really hope that he opts to put bottle in his wall somewhere. I want to put bottles in a wall.

I just typed up a list of things that need to be done before our first workshop at John's on the 16th. I now need to type up short descriptions of each of the workshops so that Jessa can start advertising. I'm not entirely sure how well I will do on this, but I'm going to go give it a shot. Once Jessa posts the schedule and descriptions somewhere, I will post it on here. I don't want to falsely advertise.

I'm feeling good about this. I'm looking stuff up in books and becoming familiar with the terminology and processes. Phil let me look through his tools that he ordered for the summer, so I now know what I need to buy. I'm looking forward to this.

Wednesday, May 28

Planning the Summer

I had a meeting with Phil and Jessa yesterday. I was waking up from a nap that I took to get rid of a headache, so I was fairly low energy. The meeting went well though and I now feel more comfortable with what I'm going to be doing this summer.

There are three buildings that I am going to be working on.
  1. John's earthbag dome. This is the structure that I'm most familiar with- I've been following the progress as John, Phil and Jessa have been designing and dealing with codes people. This structure is unique because it's actually a house. From what it sounded like, nobody has lived full-time in any of the structures that Phil or Jessa have made.
  2. Carol's cob pottery studio. This will be a round structure with a shed roof.
  3. Michelle and Rob's strawbale and cob art studio. Three walls will be strawbale and the fourth will be cob. Cob needs to be round, so the fourth wall, the southfacing wall, will be rounded, allowing for more thermal mass.

We set up a schedule for workshops for the summer. Jessa wanted to check with the project owners to make sure that the weeks we designated to work on their buildings was alright with them, so I'm going to wait until I hear confirmation from that before posting the complete schedule, but I will say (that this sentence is getting very long and) that there are nine straight weeks of workshops that I will be helping out with. The plan is to hold workshops Monday through Friday, 9 to 5 with long lunch breaks. We're hoping that each workshop has 5 to 15 people. The workshops will start June 16th, two weeks after my internship officially starts. Phil and I will be doing prep-work in those two weeks. I'm waiting to hear more about that.

June 10th I have a doctor's appointment. July 30th I go to the Warped Tour for free tabling for the Rainforest Action Network. I honestly know nothing about this- a friend of mine (Lilly) asked me if I wanted to join her. I will be recieving information in the mail to pass out, etc. I just found out that it was July, not June, so I will have to tell Jessa next time I see her.

I'm taking care of the animals now. They are sweet and wonderful. Even the shy cat (Sara) let me pet on her for a while. Good stuff.