Tuesday- Michelle's
The boys were gone and, for the first time, it was just Jessa and I working. And it went rather well. We went to Michelle's to finish taking the topsoil of the un-dug part of our foundation. (This is something that we asked the neighbor to do before digging the foundation, but somehow, it was not done.) Jessa had come out previously and dug for five hours, only getting halfway across, so I was afraid that this was going to take the whole day. I started digging while Jessa finished laying the drain tile. It wasn't bad- it was just a matter of removing the top 8 inches or so. Once Jessa hopped up and helped dig, it took no time at all. We were done by noon. Having nothing else to do on that site, we went home.
Wednesday- John's
Jessa and I were expecting a slow moving day, since it was just going to be the two of us and John. However, that was not the case. Many of the neighbors stayed and helped fill bags for a while, Jessa's mom came back out to help and we got nearly two rows layed. I filled bags some, layed barbed wire, placed bags and tamped. (A lot. I now have blisters on my hands. Tamping is still the least favorite.) At the end of the day, some of John's family came to visit and Thom Price came to visit (and bring us Italian chocolates. Yum.) It was a good day, and was far more productive than we imagined it would be.
Thursday- Jessa's
Jessa and I were on our way out to Michelle's to strip timber. We called Michelle to let her know that we were stopping by Lowes, so we'd be later than expected. When we called, Michelle informed us that the trees hadn't been delivered yet. Having nothing else to do at Michelle's, we turned around and headed back into Berea. Instead of going to John's (since he wouldn't be expecting us,) we went to finish up an example solar house for Jessa's previous job. The house was probably five feet tall at the highest point in the roof and had solar shingles and a floppy solar panel. The house just had a few finishing touches that it needed- it had a few screws that stuck out a tiny bit, the floppy solar panel needed to be attached and the floor needed to be waterproofed. The nails were tiny and only stuck out a little, but we were afraid that a kid walking through the house might scratch their finger, so we cut off the tips of the screws. (We started using little wooden biscuits to cover the tips, but it didn't seem extremely sturdy, so we decided to cut the tips off.) We then used some sticky tar-like substance to make the solar panel stick to the roof. Then we painted a thin layer of sealer onto the floor (discovering that it gets the sticky tarlike substance off our hands. Interesting.) I think Jessa was glad to finally have this project done, and I was glad for a change of pace.
Friday was supposed to be (and was) rainy (and the fourth of July), so we didn't go out.
Showing posts with label community. Show all posts
Showing posts with label community. Show all posts
Sunday, July 6
Monday, June 30
Picture bomb!
Jessa updated the HomeGrown HideAways website, adding to the blog and photo album, as well as switching a couple dates of workshops and lowering the workshop costs. Since my camera battery charger is still MIA, I stole some of her pictures. I'm going to do a quick recap of the time since my battery died...
We marked out the floor plan with marking paint directly on the foundation. We've had so many changes in the design- seeing it layed out on the ground helped a lot!
Phil and John (on the left) were the primary designers. You'll see in the photo above that we (Jeff and I, on the right) were filling bags before the design and forms were finished. I wrote about doing a lot of digging and screening in the last couple of weeks.
This is the screener (and Phil.) In the beginning, I scooped from the piles of dirt along the site directly onto the screen. The large rocks that were filtered out fell to the bottom of the screen and into a wheelbarrow (not pictured.) After a while, it was easier to shovel the dirt/clay into a bucket and pour that onto the screen. Someone would be on the other side filling bags with the finer clay/dirt mixture.
The first bags being layed were probably the most exciting, so far. There were six bags that we tamped and signed- Jessa, Phil, John, Adam, Jeff and I all got our own bags. (That's me in the picture, with Jeff and Adam's lower half.)
Our forms get a lot of questions from people who come to visit the site. Mostly, "Isn't that a small doorway?" The thing to understand about forms is that the earthbags will be stacked around them completely. Once the forms are surrounded and the arch is covered, the wood will be removed. The doorway that is in the middle of the (very large) wood arch is simply so that we can get from room to room when the walls get tall.
Each row gets two rings of bags. Each layer alternates (meaning that, in the above picture, the interior bags are vertical-ish while the exterior are horizontal-ish; for the next row, the interior will be horizontal and the top vertical.) The altering helps with structure- think bricks. In between each row of bags, we lay barbed wire. This is my favorite job on site, so far. In order to make the barbed wire stick, we have to individually poke each barb into the bags, alternating which side of the barb goes in.
We have had a lot of people helping to make the job go faster. (The picture above was taken at our end-of-day gathering.)
We haven't been at Michelle's much over the last couple of weeks, but there was one day that Phil, Jessa, Nathan and I snuck out there to get the foundation trench ready for gravel to be poured in it. This involved making cement bases for our timberframe logs.
We had to cut cardboard tubes down to size, using lines and levels and such to make sure that they were all at the same level (since the ground has a 5 inch slope from one side of the building to the other, this was very important.)
Nathan and I mixed cement. Those are 80 pound bags, so Nathan did the lifting. I held the mixer to make sure that it didn't tip. Tough job.
(I have terrible posture, I realize.) Nathan would tip the wheelbarrow up, Jessa or Phil would hold up a funnel to help guide the cement that I hoed out. Then someone would use the trowel to smooth out the top. We later stuck some J-bolts in the cement (and then got rained and hailed on and got covered in mud and dirt.)
(Today we were at John's. It was his birthday, so we had 3:00 rootbeer floats with the neighbors. Our fifth layer is done and our sixth layer is started, although, at the end of the day, we just filled bags. The electrical conduit was being placed between the fifth and sixth layer and it needs to be inspected tomorrow before we can continue placing bags. Jessa and I will be at Michelle's tomorrow and back at John's on Wednesday. Adam and Jeff are going to Florida, for different reasons, and Phil is in North Carolina on vacation with his family, so it will just be Jessa and I. Filling bags is somewhat time consuming, so Jessa suggested spending the later part of the afternoon filling bags- so we will have a stock ready for us Wednesday.)
Oh, and to clarify (because I was asked), "tamping" is compressing the contents of the bag (either using a large, flat bottomed chunk of cement ore a store-bought metal square with a broomstick-like handle) until the contents are very hard and bricklike. It requires a lot of repetitive lifting and thrusting downwards, but it works. Keeps the building solid.
We marked out the floor plan with marking paint directly on the foundation. We've had so many changes in the design- seeing it layed out on the ground helped a lot!
Phil and John (on the left) were the primary designers. You'll see in the photo above that we (Jeff and I, on the right) were filling bags before the design and forms were finished. I wrote about doing a lot of digging and screening in the last couple of weeks.
This is the screener (and Phil.) In the beginning, I scooped from the piles of dirt along the site directly onto the screen. The large rocks that were filtered out fell to the bottom of the screen and into a wheelbarrow (not pictured.) After a while, it was easier to shovel the dirt/clay into a bucket and pour that onto the screen. Someone would be on the other side filling bags with the finer clay/dirt mixture.
The first bags being layed were probably the most exciting, so far. There were six bags that we tamped and signed- Jessa, Phil, John, Adam, Jeff and I all got our own bags. (That's me in the picture, with Jeff and Adam's lower half.)
Our forms get a lot of questions from people who come to visit the site. Mostly, "Isn't that a small doorway?" The thing to understand about forms is that the earthbags will be stacked around them completely. Once the forms are surrounded and the arch is covered, the wood will be removed. The doorway that is in the middle of the (very large) wood arch is simply so that we can get from room to room when the walls get tall.
Each row gets two rings of bags. Each layer alternates (meaning that, in the above picture, the interior bags are vertical-ish while the exterior are horizontal-ish; for the next row, the interior will be horizontal and the top vertical.) The altering helps with structure- think bricks. In between each row of bags, we lay barbed wire. This is my favorite job on site, so far. In order to make the barbed wire stick, we have to individually poke each barb into the bags, alternating which side of the barb goes in.
We have had a lot of people helping to make the job go faster. (The picture above was taken at our end-of-day gathering.)We haven't been at Michelle's much over the last couple of weeks, but there was one day that Phil, Jessa, Nathan and I snuck out there to get the foundation trench ready for gravel to be poured in it. This involved making cement bases for our timberframe logs.
We had to cut cardboard tubes down to size, using lines and levels and such to make sure that they were all at the same level (since the ground has a 5 inch slope from one side of the building to the other, this was very important.)
Nathan and I mixed cement. Those are 80 pound bags, so Nathan did the lifting. I held the mixer to make sure that it didn't tip. Tough job.
(I have terrible posture, I realize.) Nathan would tip the wheelbarrow up, Jessa or Phil would hold up a funnel to help guide the cement that I hoed out. Then someone would use the trowel to smooth out the top. We later stuck some J-bolts in the cement (and then got rained and hailed on and got covered in mud and dirt.)(Today we were at John's. It was his birthday, so we had 3:00 rootbeer floats with the neighbors. Our fifth layer is done and our sixth layer is started, although, at the end of the day, we just filled bags. The electrical conduit was being placed between the fifth and sixth layer and it needs to be inspected tomorrow before we can continue placing bags. Jessa and I will be at Michelle's tomorrow and back at John's on Wednesday. Adam and Jeff are going to Florida, for different reasons, and Phil is in North Carolina on vacation with his family, so it will just be Jessa and I. Filling bags is somewhat time consuming, so Jessa suggested spending the later part of the afternoon filling bags- so we will have a stock ready for us Wednesday.)
Oh, and to clarify (because I was asked), "tamping" is compressing the contents of the bag (either using a large, flat bottomed chunk of cement ore a store-bought metal square with a broomstick-like handle) until the contents are very hard and bricklike. It requires a lot of repetitive lifting and thrusting downwards, but it works. Keeps the building solid.
Labels:
barbed wire,
community,
earthbag,
filling bags,
floorplan,
forms,
foundation,
Jeff,
John,
Michelle and Rob,
pictures,
rain,
schedule,
tamping,
timberframe,
workshops
Saturday, June 14
Machetes and Excavations
It has been several days since my last update.
A guy named Jeff had e-mailed Jessa volunteering to come help at the workshops. From what I understand, he has studied at Cal-Earth and just finished the bagwork on a double eco-dome somewhere. We needed to decide if we wanted to let him come on board for free or allow him to do some kind of work exchange. E-mails circulated and a meeting was held with John. Jeff is going to come up, I believe, although nobody really has a place for him to stay... (I honestly don't know too much about this situation...)
Phil and I returned to the bamboo site that I mentioned in my last post. We want to use bamboo as a thatched ceiling in John's house, so we needed a lot. I used a reciprocating saw to cut down the stalks and Phil used a machete to clear the extra limbs and leafs off them. The patch was huge, so after a couple hours of cutting, we had hardly made a dent in the supply.
Adam and I returned the next day. (Have I mentioned that Adam is back up here?) Jessa and Phil had alternative things to do- this was the first time we've ever been split up doing non-computer work. We cut bamboo for a few more hours.
Adam, trimming with a machete.

The truck, full of bamboo.
A lot of dirt.
Phil and Jessa, making sure the trench for the foundation was satisfactory.

After visiting Michelle's, we met up with Howard Carlberg at his home in Berea. He cooked us lunch (which was fabulous because we were very hungry.) He had an idea to build a cob oven somewhere in Berea, but wanted to make sure that it was used for something (as opposed to just being a structure to point at and say "we have that.") Howard is very involved with the folk dancing that happens in Berea, so one thought that he mentioned was firing up the oven when there were festivals. While no decisions or agreements were made between Howard and HomeGrown HideAways, I think Howard got ideas about how to make his cob oven something for the community to enjoy.
A guy named Jeff had e-mailed Jessa volunteering to come help at the workshops. From what I understand, he has studied at Cal-Earth and just finished the bagwork on a double eco-dome somewhere. We needed to decide if we wanted to let him come on board for free or allow him to do some kind of work exchange. E-mails circulated and a meeting was held with John. Jeff is going to come up, I believe, although nobody really has a place for him to stay... (I honestly don't know too much about this situation...)
Phil and I returned to the bamboo site that I mentioned in my last post. We want to use bamboo as a thatched ceiling in John's house, so we needed a lot. I used a reciprocating saw to cut down the stalks and Phil used a machete to clear the extra limbs and leafs off them. The patch was huge, so after a couple hours of cutting, we had hardly made a dent in the supply.
Adam and I returned the next day. (Have I mentioned that Adam is back up here?) Jessa and Phil had alternative things to do- this was the first time we've ever been split up doing non-computer work. We cut bamboo for a few more hours.
I learned that trimming with a machete is far easier than trimming with pruning shears, but trimming with pruning shears is infinitely easier than trimming with my utility knife thingy-ma-bob.
Jessa met up with Adam and I in the afternoon to move all the cut bamboo. She had brought the trailer to the truck because she knew the pieces wouldn't all fit in the truck. I think we underestimated the bamboo.
Jessa met up with Adam and I in the afternoon to move all the cut bamboo. She had brought the trailer to the truck because she knew the pieces wouldn't all fit in the truck. I think we underestimated the bamboo.
We took the bamboo up to John's house. The ride there was not an issue at all. We had wrapped bungee cords around the bamboo to keep it together and attached the bundled bamboo to the truck and trailer with a few more cords. The trouble came once we got to John's. The road from the entrance to Egret's cove and to John's plot of land is steep(ish) and rocky, with little room to turn around at the top. Since Jessa isn't entirely comfortable backing the trailer up, we decided to detach the trailer and let the bamboo drag on the way up. It worked until we were about 20 feet away from the site- the hill got too steep and the bamboo decided it didn't want to be bundled anymore. It came out of the truck and scattered across the road. (Across, not down. We didn't have to go chasing it down the hill.) We decided we were close enough and, since Egret's Cove is an intentional community, we left the bamboo there, scootching it off the road. Good enough. ^_^
The next day, we all woke up early to go help with the excavation at Michelle's house. We had marked out the foundation last time we were there. From our soil testing, we thought that there was only 6 inches or so of soil before hitting bedrock. One we got the excavator (Michelle's neighbor) in there, we found out that it was very much not true. There was just a lot of flat rock near the top...
The next day, we all woke up early to go help with the excavation at Michelle's house. We had marked out the foundation last time we were there. From our soil testing, we thought that there was only 6 inches or so of soil before hitting bedrock. One we got the excavator (Michelle's neighbor) in there, we found out that it was very much not true. There was just a lot of flat rock near the top...
There wasn't much to do during the excavation (since only the man on the Bobcat could actually do anything.) We ended up sitting under a tree on some blankets for a few hours, discussing foundations and other details of the house. I figured out how much clay was needed for the site. Hooray math! I met Rob for the first time, cooed over the adorable baby, moved Michelle's windows into the barn and ate a granola bar. Nothing too strenuous.
After a few hours, the perimeter was dug.
After a few hours, the perimeter was dug.
The excavator moved the dirt into the lawn and flattened it; it will probably be used for raised bed gardens later. He also went ahead and dug the draining trenches.
After visiting Michelle's, we met up with Howard Carlberg at his home in Berea. He cooked us lunch (which was fabulous because we were very hungry.) He had an idea to build a cob oven somewhere in Berea, but wanted to make sure that it was used for something (as opposed to just being a structure to point at and say "we have that.") Howard is very involved with the folk dancing that happens in Berea, so one thought that he mentioned was firing up the oven when there were festivals. While no decisions or agreements were made between Howard and HomeGrown HideAways, I think Howard got ideas about how to make his cob oven something for the community to enjoy.
Labels:
bamboo,
community,
earthbag,
foundation,
Howard Carlberg,
John,
meeting,
Michelle and Rob,
pictures,
strawbale,
visitors,
workshops