Tuesday, July 8

I'm a barb-y girl.

(This entry is long and disorganized and possibly confusing. This is your prewarning.)

Today was a good day out at John's. Not that we ever have bad days. I just feel like there was a lot to say about today. I think I did a tiny bit of everything today at the site. Even tamping. Barely.

Richard, the SENS director at Berea and one of my professors, came out to visit the site. He asked how everything was going- it was still a little too early in the morning to be entirely enthusiastic, so I think he got short answers. He asked if I was learning a lot, which I kept thinking about throughout the day. Yes, I have learned a lot. It's very specific though; I have learned a lot about building an earthbag dome. I have learned how to strip trees and pour concrete and hammer without smashing my thumb. I am gaining comfort with the processes of natural building. I think when I began my internship, natural building was something that I had just read about, seen pictures of, and seen in the movies Richard showed. While it made sense, it wasn't extremely tangible. Now that I've been working on the process for several weeks now, I recognize the amount of work, thought, time and materials that goes into natural building. I think this means I'm learning things.

While I've done this before, I feel that I should mention to my Loyal Blog Readers a process that I get too much joy out of doing- that is, pinning bags. There are a few places in the walls where a bag's open end will be facing an open area (as opposed to our normal stacking method where the open ends stack against other bags, keeping everything tight.) Simply folding the bags' ends doesn't work very well- they tend to come open and spill dirt. Instead, we fold over the ends and take two nails and pin the side using the nails. Sometimes it's tough to get the nails to go all the way through- those bags are tough. Phil suggested using tie-wire instead of nails- to make the wire go in and out and twist it shut. I tried that and it worked decently, but the wire bent a bit as I tried to stick it though the bags. I could go either way as far as what I pin the bags with, but I like the look of (and get more personal enjoyment out of) using nails.

Phil also showed me another way to lay the barbed wire. Once the walls get to be four feet high (which will be very soon,) we will start the curve to the dome. We will take each layer in a bit more. Since our bags are so much smaller than typical bags used for earthbag building (I think ours are a foot wide,) we decided to make the walls two bags wide. This will make it easier to tamp and give a little more structural integrity.

I do not feel capable of explaining this correctly. Thus, drawings! Behold, my mad Paint skillz.

(Above) This is the way we are currently stacking our walls. (This would be the view from above.) Each course would look like this, but the directions of the bags alternate. (The next course would, if drawn, have the vertical bags on top and the horizontal on bottom.) The red shows where we put our barbed wire. On the vertical bags, we keep it low enough to be able to snatch onto the horizontal bags that will be stacked on top of it. (I hope this makes sense.)
This is the way that we are switching to after four feet. Because the bags are not alternating directions, they are, essentially, forming two walls side by side. We need to connect the two walls. So we use barbed wire.
This is the method that I started doing. It was very similar to my straight barbed wiring in that it was forced into place and pinned where I wanted it.
This is what Phil suggested. He called this method "serpentine." Instead of straightening the barbed wire when pulling it off the roll, we keep the natural curl and just lay that down. Sounds good in theory, but I really did not like it. It did not want to stay flat on the bags and kept jumping up and smacking my arms. I didn't feel like I had much control over it. I used it for a while, but then decided to switch back to my method.

(I am now done with my explaining of barbed wire.)

John had me do more math today to figure out how many bags we were going to need for something. (Now that I think of it, I can't remember what exactly was being calculated. I was too focused on numbers.) I really am rusty on my math. Easy math too. Subtraction. But I came up with the right answer eventually.

It rained today- we saw the clouds coming and were pretty ready to run to the neighbor's porch by the time it started raining on us. It was a hard rain, for about 15 minutes. We took some bags that needed to be turned inside out onto the porch.

There are two dogs at Egret's Cove and I love them very much. They both came up to the site today to walk around and visit. One of the dogs, who is quite short, followed Jessa up onto the wall, which is fairly tall. It was immensely cute.

***

Yesterday, Phil and I went out to Michelle's and stripped trees for her timberframe. I used a machete and a draw knife. Both of these had very short handles (in comparison to Phil's tool that I cannot remember the name of that had a very long handle with a flat metal piece on the end for wedging underneath the bark.) This means, I got to crawl all over these logs. Most of the logs were pine, and the amount of rosin they contained was ridiculous. When I got home, my shins and arms had rosin and dirt crusted on them. My back also hurt from leaning over all day. We left with one and two half trees left to de-bark. We stripped 10. We are going back tomorrow to finish stripping and start filling bags for Michelle's earthbag stemwall.

Thursday, June 26

Productivity!

First, we had lots of help lately(Adam, Jeff, Lilly, Jessa's mom, Nathan, and random other visitors.) These people have been providing lots of entertainment, as well as energy and extra hands to do some work.

Second, we found a quicker method of filling bags. Instead of using the dirt that was excavated, which needed to be sifted because it was full of large rocks and clay chunks, we are using rock dust, which comes from the quarry up the road. We fill a bucket about halfway with rock dust and then dump it into a bag that is being held by someone who gets the (oh-so-difficult) job of sitting on a bucket, holding a bag. (I don't really like that job.) This goes a lot quicker, although the bags weigh more. The bags are about twice as thick though, so we won't need as many to build the dome. (There was a point where we thought we might need twice as many bags as originally predicted. I'm not sure what the new estimate is, although, since these bags are fairly small, we will be putting in a second order.) Right now, the rock dust pile is at the bottom of the hill, so it needs to be hauled in a truck up to John's site (but tomorrow someone with a bobcat is coming to move the pile to the top of the hill.)

While half the team is filling bags at the bottom of the hill, the other half has been at the top of the hill, placing bags, tamping and barb-wiring.

We are about a third of the way done with our fourth layer.

It rained today. Not for a long time. Just enough to cool us down (and get our clothes wet.)

(Just a note- we are tying extra bits of wire to the barbed wire that stick out a few inches towards the interior of the building. This wire will later be used to tie chicken wire to the walls. This chicken wire will help the earthen plaster stick to the bags better. Ingenious.)

None of this is particularly easy work. Some parts are more labor intensive than others. My order of preference (so far) on these jobs is as follows:
  1. laying barbed wire
  2. placing bags
  3. filling and pouring buckets
  4. holding the bags as they are filled
  5. tamping
But I'll do whatever I'm told. (Although I suck at tamping, so far. I am good at barb-wiring.)

My back has been a little sore lately (which is why holding the bags as they are being filled is so low on my list- it just hurts.) I'm fairly certain that my posture is terrible. I bought a back brace today at Lowes, although I'm not sure if my ego will allow for me to wear it. We will see. (I also bought a pair of gloves similar to Jessa's- I have worn them and know that they fit and that I like them. I want to wear them everywhere. I also bought two cheap-o pairs of gloves for my guests who are helping out. Also bought some new headbands, since mine are getting so gross so fast.)

Jeff is going to be with us for the summer. The original plan was a two week visit (which would be over tomorrow- hard to believe) and then he'd be off to do some natural building in Spain. The Spain thing got canceled, so he's going home for a week or so and then coming back. I think he wants to learn more about plastering.

Sunday, June 22

And now, a guest entry from Adam!

Hi, this is Adam.

I like to visit Erin when I am not busy at home and during this visit I volunteered my help towards her internship.

The last two days have been tough. Thursday we started laying all of the earth-bags we had filled which almost completed the first layer. I can tell this is going to be very tedious process from here on- digging the dirt to be sifted - filling the sifted dirt into bags and then laying them - and finally tamping them. Tamping is where my energy has been spent the last two days- it takes a lot out of me.

Not a lot of progress was made at John's site Friday. John, Jeff, and I didn't spend a lot of time on a particular job. I stuck to tamping for the most part until John mentioned needing trenches dug for drains to empty through. After I dug a trench for two sinks and a shower, the site looked a small mess. I await to hear Phil's thoughts on our progress/changes.

A few of John's friends showed up in the afternoon Friday. We gave them a tour of the site and surrounding projects, such as the straw bale house. In return they brought us extra lunch and provided wonderful conversation and company for an hour or so. Sometime after that we called it quitting time and I drove Jeff home. It was a good steady day for a Friday, and a good way to start the weekend.

I will not be able to be here for a majority of the project, but hope to visit again to help and maybe see the finished production of John's house.

Saturday, June 14

Machetes and Excavations

It has been several days since my last update.

A guy named Jeff had e-mailed Jessa volunteering to come help at the workshops. From what I understand, he has studied at Cal-Earth and just finished the bagwork on a double eco-dome somewhere. We needed to decide if we wanted to let him come on board for free or allow him to do some kind of work exchange. E-mails circulated and a meeting was held with John. Jeff is going to come up, I believe, although nobody really has a place for him to stay... (I honestly don't know too much about this situation...)

Phil and I returned to the bamboo site that I mentioned in my last post. We want to use bamboo as a thatched ceiling in John's house, so we needed a lot. I used a reciprocating saw to cut down the stalks and Phil used a machete to clear the extra limbs and leafs off them. The patch was huge, so after a couple hours of cutting, we had hardly made a dent in the supply.

Adam and I returned the next day. (Have I mentioned that Adam is back up here?) Jessa and Phil had alternative things to do- this was the first time we've ever been split up doing non-computer work. We cut bamboo for a few more hours.
Me, trimming with pruning shears.


Adam, trimming with a machete.

I learned that trimming with a machete is far easier than trimming with pruning shears, but trimming with pruning shears is infinitely easier than trimming with my utility knife thingy-ma-bob.

Jessa met up with Adam and I in the afternoon to move all the cut bamboo. She had brought the trailer to the truck because she knew the pieces wouldn't all fit in the truck. I think we underestimated the bamboo.

The truck, full of bamboo.

We took the bamboo up to John's house. The ride there was not an issue at all. We had wrapped bungee cords around the bamboo to keep it together and attached the bundled bamboo to the truck and trailer with a few more cords. The trouble came once we got to John's. The road from the entrance to Egret's cove and to John's plot of land is steep(ish) and rocky, with little room to turn around at the top. Since Jessa isn't entirely comfortable backing the trailer up, we decided to detach the trailer and let the bamboo drag on the way up. It worked until we were about 20 feet away from the site- the hill got too steep and the bamboo decided it didn't want to be bundled anymore. It came out of the truck and scattered across the road. (Across, not down. We didn't have to go chasing it down the hill.) We decided we were close enough and, since Egret's Cove is an intentional community, we left the bamboo there, scootching it off the road. Good enough. ^_^

The next day, we all woke up early to go help with the excavation at Michelle's house. We had marked out the foundation last time we were there. From our soil testing, we thought that there was only 6 inches or so of soil before hitting bedrock. One we got the excavator (Michelle's neighbor) in there, we found out that it was very much not true. There was just a lot of flat rock near the top...

A lot of dirt.

There wasn't much to do during the excavation (since only the man on the Bobcat could actually do anything.) We ended up sitting under a tree on some blankets for a few hours, discussing foundations and other details of the house. I figured out how much clay was needed for the site. Hooray math! I met Rob for the first time, cooed over the adorable baby, moved Michelle's windows into the barn and ate a granola bar. Nothing too strenuous.

After a few hours, the perimeter was dug.

Phil and Jessa, making sure the trench for the foundation was satisfactory.

The excavator moved the dirt into the lawn and flattened it; it will probably be used for raised bed gardens later. He also went ahead and dug the draining trenches.


After visiting Michelle's, we met up with Howard Carlberg at his home in Berea. He cooked us lunch (which was fabulous because we were very hungry.) He had an idea to build a cob oven somewhere in Berea, but wanted to make sure that it was used for something (as opposed to just being a structure to point at and say "we have that.") Howard is very involved with the folk dancing that happens in Berea, so one thought that he mentioned was firing up the oven when there were festivals. While no decisions or agreements were made between Howard and HomeGrown HideAways, I think Howard got ideas about how to make his cob oven something for the community to enjoy.

Monday, June 2

First Day

Hi folks. I haven't been around my computer lately and I haven't wanted to post without being on my own computer.

I had a meeting with Jessa, Phil and John (owner of the earthbag project) on Friday (I think.) A lot was said to finalize plans on John's house. A lot of what is said was technical, design stuff and I didn't feel like I could contribute so much to that part of the conversation; I think I will be far more helpful when we actually start building.

John got a building permit.
This is an amazingly good thing. The entire time I have been involved with this internship, the others have been pushing for the codes office to give John a building permit. There are no earthbag residencies in this region, so codes officials were extremely hesitant about giving the permit. Now, as long as everything goes well in the building process, people who want to build with earthbag should have a much easier time getting their permits. Groundbreaking stuff, kids.

Carol's cob house has been moved outside my internship. She doesn't feel that she will be ready to build until late August/early September, which is past the internship end. I was looking forward to the round cob house, but I will have an opportunity to build with cob when I work on Michelle and Rob's studio.

My internship officially starts today, although I don't think that there's anything for me to be doing today. I'm a little in the dark right now about what I'm supposed to be doing- I'm just waiting for Phil or Jessa to tell me to do something.

In other news, Adam (boyfriend) is visiting for a few days, so I've been playing with him lately. He likes the SENS house and, hopefully, will help me get a bed into the room I'm wanting to move into. Then I can unload boxes.

I have a giant fear that I'm going to kill all my friends' plants that they left with me for the summer.