Saturday, August 2

Up until Monday.

Again, I procrastinate updating until it becomes a big headache of a job... Here goes...

We bought some new wood to cut the stairs out of, since the wood we had delivered had split significantly. I marked the wood and Phil cut. Phil and Jessa moved the stairs into place, put in some support beams and treads and we were ready to go.

After checking to make sure that it was the right height, Phil and Jessa trace the original stair side.

Stairs in place.

Adam and I routered and sanded the edges of the stairs.

We had a slow day, so we decided to do some art projects. We needed wood plates to cover the seam where the beams that the floor joists rest on meet. Holes will later be drilled through the plates, beams, and post and will be filled with a threaded metal pole with screws on the end, holding everything securely. Jessa suggested designing the wood plates so that they wouldn't just be square- to put some kind of unique design on each plate. Adam and I worked together on this...


There was a lot of debate about our design. It had to be fat in the middle and fairly long. Adam and I sketched out some ideas, but eventually decided on the silhouette of an ant, since there were so many around (and we destroyed enough ant hills in the process of making this building.)

I jigsawed the ant design out.

Adam shows off the finished product.

After screwing the plates into place (there was also a cloud and an abstract circle design, but the ant was the best,) we tried to drill the holes through the post, beams and such using an auger.

We drilled one hole successfully, but about midway through the second hole, the drill started smoking and died (even though we had given it some breaks in between.) We've tried other drills since, but none seem to have the power we need to make it through everything... So the plates and extra support is still waiting to happen.

Phil, Adam and I (Jessa was out of town) started putting on some sidebeams (unofficial name, I'm sure) that the rafters would later sit on. At first, we were trying to move 17 foot 3x10's, but we soon realized that, since our posts weren't perfectly squared anyway, we could just put the beams up in sections.

Our first section up.

Required some temporary walkways on the outside of the building.

One side done.

More has happened since. There's still almost a full week to document. This weekend will help me catch up. Keep an eye out for updates.

Thursday, June 26

Productivity!

First, we had lots of help lately(Adam, Jeff, Lilly, Jessa's mom, Nathan, and random other visitors.) These people have been providing lots of entertainment, as well as energy and extra hands to do some work.

Second, we found a quicker method of filling bags. Instead of using the dirt that was excavated, which needed to be sifted because it was full of large rocks and clay chunks, we are using rock dust, which comes from the quarry up the road. We fill a bucket about halfway with rock dust and then dump it into a bag that is being held by someone who gets the (oh-so-difficult) job of sitting on a bucket, holding a bag. (I don't really like that job.) This goes a lot quicker, although the bags weigh more. The bags are about twice as thick though, so we won't need as many to build the dome. (There was a point where we thought we might need twice as many bags as originally predicted. I'm not sure what the new estimate is, although, since these bags are fairly small, we will be putting in a second order.) Right now, the rock dust pile is at the bottom of the hill, so it needs to be hauled in a truck up to John's site (but tomorrow someone with a bobcat is coming to move the pile to the top of the hill.)

While half the team is filling bags at the bottom of the hill, the other half has been at the top of the hill, placing bags, tamping and barb-wiring.

We are about a third of the way done with our fourth layer.

It rained today. Not for a long time. Just enough to cool us down (and get our clothes wet.)

(Just a note- we are tying extra bits of wire to the barbed wire that stick out a few inches towards the interior of the building. This wire will later be used to tie chicken wire to the walls. This chicken wire will help the earthen plaster stick to the bags better. Ingenious.)

None of this is particularly easy work. Some parts are more labor intensive than others. My order of preference (so far) on these jobs is as follows:
  1. laying barbed wire
  2. placing bags
  3. filling and pouring buckets
  4. holding the bags as they are filled
  5. tamping
But I'll do whatever I'm told. (Although I suck at tamping, so far. I am good at barb-wiring.)

My back has been a little sore lately (which is why holding the bags as they are being filled is so low on my list- it just hurts.) I'm fairly certain that my posture is terrible. I bought a back brace today at Lowes, although I'm not sure if my ego will allow for me to wear it. We will see. (I also bought a pair of gloves similar to Jessa's- I have worn them and know that they fit and that I like them. I want to wear them everywhere. I also bought two cheap-o pairs of gloves for my guests who are helping out. Also bought some new headbands, since mine are getting so gross so fast.)

Jeff is going to be with us for the summer. The original plan was a two week visit (which would be over tomorrow- hard to believe) and then he'd be off to do some natural building in Spain. The Spain thing got canceled, so he's going home for a week or so and then coming back. I think he wants to learn more about plastering.

Sunday, June 8

Spending Someone Else's Money

In the last 48 hours, I have spent $232.41 on internship related stuff. I have bought:
-a tool belt (the bag and the belt were sold separately. Weird.)
-a tool bag.
-four trowels (different sizes)
-ear plugs
-safety glasses (super attractive)
-a square. For some reason, I have negative feelings towards squares. Probably because of my middle school shop class.
-super grippy work gloves (that were more expensive than I thought work gloves should be.
-wire cutters
-25 foot tape measurer
-a line level
-a hammer
-rainboots (found them yesterday- need to get reimbursed.)
-all kinds of first-aid stuff. I think my summer as a trailwalker taught me to carry a big first aid kit. I think I spent about $50 on first aid stuff.

I still need a flip-out utility knife. I've been wanting one of these for a while now, so I'm glad that I actually have a reason to get one. I also might buy another pair of Keens like the one I have, so I don't have to ruin my pair. I also might buy some more shorts. And maybe the two books that Phil is letting me borrow.

I need to keep track of my gas mileage so that I can be reimbursed. Reimbursement for gas is a good thing, because the car I'm using uses a higher quality of gas than normal. Oy. Expensive stuff.